AB-EQUIPMENT

DATE 2022-2023

LOCATION Rakanui rd Taupo

SECTOR Commercial

DURATION 8 months

VALUE $1.1 milion

CLIENT Godfrey Properties 2000 Ltd

Wade Construction have returned to AB - Equipment to carry out extension works on the original building they built 3 years ago.

The 8 bay workshop was constructed over several months with side and rear entrance areas allowing for large scale machinery to be parked with ease and worked upon in a light open aired workshop setting.

  • Wash Down Bay

  • Driveway and turning bay areas carried out by the Wade Construction team.

Previous
Previous

KEEHAN DRIVE